ShowStart logo
showstart
Production Intelligence Review

Catch costly production mistakes before show day.

Missing one overlooked item can cost more than an entire year of ShowStart. Analyze quotes, riders, schedules, and production documents instantly — before small mistakes become expensive problems.

Built by live production people, for live production people

Production Analysis — Summer Festival 2025
2
Critical
3
Warnings
1
Notes
CRITICALPower
No backup generator specified
Venue has no house power contingency for outdoor stage.
WARNINGAudio
Monitor mix mismatch
Rider calls for 8 aux mixes; stage plot shows 6 sends.
WARNINGCrew
Load-in crew shortage
Schedule lists 4 stagehands; quote approved for 2.
CRITICALSchedule
Incomplete load-in timing
No time allocated for AV pre-rig before doors.
NOTELogistics
Truck access not confirmed
No dock assignment or staging area noted in site map.
Built for live event professionals
Cross-document conflict detection
Designed for real-world workflows

How It Works

From upload to actionable report in minutes.

01

Upload production documents

Quotes, riders, labor schedules, stage plots — any format. Drop them in and we get to work.

02

Built to catch what gets missed

Detects missing items, schedule conflicts, rider mismatches, and cross-document inconsistencies in seconds.

03

Resolve issues before show day

Get a prioritized findings report. Fix problems before they cost you crew hours, client trust, or the show itself.

What It Catches

The issues that slip through every review.

Real production problems found by ShowStart — the kind that cost you crew hours, client trust, and show integrity

CRITICAL

Missing power requirements

Backline rider specifies 30A single-phase. Venue quote shows 20A only.

WARNING

Labor schedule conflict

Audio crew called for 7AM. Load-in doors don't open until 9AM.

CRITICAL

Incomplete load-in timing

No pre-rig window allocated before production day begins.

WARNING

Rider inconsistency

Stage plot shows 3 vocal mics. Rider input list specifies 5.

NOTE

Missing backup equipment

No spare wireless systems listed for a 4-pack RF show.

WARNING

Crew shortage flagged

Quote approved for 4 stagehands; labor schedule calls for 7.

Most show-day problems
begin in pre-production

ShowStart helps you catch them before your crew or client does.